This content requires the base game Train Simulator Classic on Steam in order to play.

All Reviews:
Mixed (38) - 60% of the 38 user reviews for this game are positive.
Release Date:
Mar 1, 2017
Developer:
Tags

Sign in to add this item to your wishlist, follow it, or mark it as ignored

Check out the entire Train Simulator Classic franchise on Steam

Downloadable Content

This content requires the base game Train Simulator Classic on Steam in order to play.

Buy Train Simulator: North London & Goblin Lines Route Add-On

 

About This Content

Stretching across North and East London, the Gospel Oak to Barking Line – affectionately known as the ‘GOBLIN’ – has grown into a major part of the extensive London Overground network; a network which has specialised in re-vitalising neglected routes throughout the Capital, converting them into railways which are fit to serve a modern-day city. Explore the railways in the north of the Capital with the North London & Goblin Lines Route Add-On for Train Simulator.

The Gospel Oak to Barking Line was formed from an amalgamation of routes built in the 19th Century; the Tottenham and Hampstead Junction Railway, which opened in 1868 and spanned North London from Highgate Road to Tottenham North Junction; and the Tottenham and Forest Gate Railway, which first saw trains in 1894 and connected Tottenham to the existing line at Barking. Various stations have played as the terminus for each end of the line, including St. Pancras, Kentish Town, Moorgate, East Ham, Barking, Tilbury and Southend (the latter two being for specials only), however, the line came to Gospel Oak in 1981, and has stayed between there and Barking since.

Due to the GOBLIN’s route being a very indirect one into and out of London, it was pencilled in for closure under the infamous Beeching Report. By chance, very little of the Capital’s proposed changes took place, and the line itself escaped the axe. Even with the line remaining open, much of it suffered from poor maintenance and reliability would suffer greatly, trains not built to cope with the commuter demand were forcibly in service across the line, and all platform staff soon disappeared. Only one train per hour was operating by 1980, not ideal as an East-to-North connection.

Improvements would start to roll in with privatisation, National Express’ Silverlink introduced newer Class 150 DMUs across the line in 2000, along with CCTV and Information Points, all of which gave a great boost to reliability. It wouldn’t be until Transport for London took over though, that major developments would be seen and brand new, purpose-built rolling stock would arrive. By 2007, the line was operated by London Overground and new services were added at peak hours, weekend & evenings, platform staff were reinstated, the line was included as part of the Oyster Card system and added to the Tube Map.

In 2010, an 8-strong fleet of new Class 172 ‘Turbostar’ DMUs entered service, replacing the Class 150s and providing more comfortable and spacious journeys throughout. Despite this however, even these new Turbostars were not enough to meet capacity demands, and TfL began looking at longer DMUs that could replace them. Before an order was settled however, it was announced that the GOBLIN would be electrified, making diesel obsolete.

Since June 2016, extensive work has started to erect 25kV AC overhead catenary over the GOBLIN. Everything from track lowering, bridge rebuilding, platform lengthening and much more is required to ready the line for new electric services; the line was partially closed until September 2016, and has been fully closed since. Services are set to begin once again in February 2017, and with further evening and weekend works, the GOBLIN will be fully electrified by the end of the year, ready for a fleet of brand new 4-car Class 710 ‘Aventra’ EMUs to take over from the Class 172s in 2018.

The Gospel Oak to Barking Line has had some tough calls in its past, but has risen from strength to strength in recent years, thanks to the projects of London Overground, and is today a major commuter route for those in North & East London that is set to only improve in the future.

The North London & Goblin Lines for Train Simulator is a stunning recreation of the North London Line (between Richmond and Stratford), GOBLIN (between Gospel Oak and Barking) and the West London Line (between Willesden Junction and Clapham Junction), all operated by London Overground Rail Operations Ltd. When combined with the various freight connections and locations, the North London & Goblin Lines easily boasts more than forty-miles-worth of suburban railway to explore.

Included Passenger Lines

  • GOBLIN: Gospel Oak to Barking
  • North London Line: Richmond to Stratford
  • West London Line: Willesden Junction to Clapham Junction

Notable Freight Locations

  • Willesden Brent Sidings and Royal Mail Terminal
  • Carlton Road Junction – connecting the Goblin to the Midland Main Line
  • Woodgrange Park Junction – connecting the eastern side of the Goblin to Stratford
  • Ripple Lane Yard
  • Dagenham Dock & Motorworks
  • Connections to High Speed 1 & the London, Tilbury and Southend Railway

Included Trains/Locos

  • BR Class 172 ‘Turbostar’ DMU in LOROL livery
  • BR Class 378 ‘Capitalstar’ EMU in LOROL livery

Included Scenarios

The North London & Goblin Lines Route Add-on includes seven engaging scenarios:
  • 01. Cruising the Goblin: Part 1
  • 02. Cruising the Goblin: Part 2
  • 03. One Time Only: Part 1
  • 04. One Time Only: Part 2
  • 05. A Turbulent Shift
  • 06. The Goblin’s Going Blind
  • 07. Business as Usual

More scenarios are available on Steam Workshop online and in-game. Train Simulator’s Steam Workshop scenarios are free and easy to download, adding many more hours of gameplay. With scenarios being added daily, why don’t you check it out now!

Click here for Steam Workshop scenarios.

Key Features


  • 40+ mile route covering the North London Line, West London Line and Gospel Oak to Barking Line, plus various freight connections throughout
  • Two modern multiple units: BR Class 172 ‘Turbostar’ and BR Class 378 ‘Capitalstar’
  • Seven authentic and challenging Career Scenarios
  • Railfan Mode Scenarios
  • Quick Drive Compatible
  • Download size: 177.5 mb

System Requirements

    Minimum:
    • OS *:Windows® 7 / 8.1
    • Processor: 2.8 GHz Core 2 Duo (3.2 GHz Core 2 Duo recommended), AMD Athlon MP (multiprocessor variant or comparable processors)
    • Memory:4 GB RAM
    • Graphics:512 MB - 1GB with Pixel Shader 3.0 (AGP PCIe only)
    • DirectX®:9.0c
    • Hard Drive:40 GB HD space
    • Sound:Direct X 9.0c compatible
    • Other Requirements:Broadband Internet connection
    • Additional:Quicktime Player is required for playing the videos
    • Graphics:Laptop versions of these chipsets may work but are not supported. Updates to your video and sound card drivers may be required
* Starting January 1st, 2024, the Steam Client will only support Windows 10 and later versions.

More DLCs from this game

More from Train Simulator Classic

Customer reviews

Review Type


Purchase Type


Language


Date Range
To view reviews within a date range, please click and drag a selection on a graph above or click on a specific bar.

Show graph



Display As:
Show graph
 
Hide graph
 
Filters
Excluding Off-topic Review Activity
Playtime:
Loading reviews...