您必須在 Steam 上擁有遊戲主程式 Train Simulator Classic 2024 才能遊玩此內容。

所有評論:
極度好評 (116) - 116 篇使用者評論中有 87% 給予此遊戲好評。
發行日期:
2015 年 12 月 11 日
開發人員:
標籤

登入以將此項目新增至您的願望清單、關注它,或標記為已忽略

在 Steam 上查看整套 Train Simulator Classic 系列作品
不支援繁體中文

本產品尚不支援您的目前所在地的語言。購買前請先確認語言支援清單。

可下載的內容

您必須在 Steam 上擁有遊戲主程式 Train Simulator Classic 2024 才能遊玩此內容。

購買 Train Simulator: Semmeringbahn - Mürzzuschlag to Gloggnitz Route Add-On

 

關於此內容

The picture postcard scenery of the Austrian Alps dominate the stunning new Semmeringbahn: Mürzzuschlag to Gloggnitz route for Train Simulator.

Built by more than 20,000 worked between 1848 and 1854, the 41km (25 mile) Semmeringbahn (Semmering Railway) was the first standard gauge mountain railway ever constructed and is considered the first ‘true’ mountain railway, due to its immense change in altitude and challenging terrain it traverses throughout the route.

Connecting the Austrian towns of Mürzzuschlag and Gloggnitz in the east of the country, the Semmeringbahn features some of the most stunning railway scenery seen anywhere in the world – two-storey high viaducts, more than 100 stone bridges, 16 tunnels and 11 iron bridges are prominent throughout the route. The line itself sees a 457m altitude difference in its 41km in length, and 60% of the track is on a 2-2.5% (around 1:40) gradient, with as much as 16% featuring very tight radius curves at only 190m.

From Gloggnitz in the east, the line passes through a number of small hamlets high in the mountainous Alps to Payerbach-Reichenau, where local passenger services from Vienna terminate. It is here that one of the Alps’ major ski resorts is located, as well as a heritage railway running in the mountains. Heading southwards, the line crosses the stunning Schwarza Viaduct before Küb and Klamm-Schottwein, where the landscape is most famous for the expansive S6 motorway viaduct.

Between Klamm-Schottwein and Breitenstein, trains pass through probably the most famous part of the route, The Viaduct – a spectacular open-sided tunnel that provides a photographer’s dream setting. From Semmering (the highest point on the route), the line heads downhill towards Mürzzuschlag, where large freight yards and a locomotive maintenance and servicing yard dominate.

At the time of opening, the incredible grades and tight curves resulted in the need for new locomotives that could more easily handle the task. Thus, a competition was held to find traction that was able to traverse the grades and curves while maintaining a minimum speed of 11.5km/h (7mph).

Eventually, the railway settled for the Engerth locomotive, a unique articulated tender locomotive that had a top speed of 19km/h (11mph) up the steepest gradients thanks to the weight of the fuel and water being spread across all the axles, providing more traction.

The increased accessibility to the mountains thanks to the railway saw a number of purpose-built Alpine resorts, with parts of the railway becoming known for their summer orientated architecture such as hotels and villas. It also lead to the construction of residential areas, creating a new form of landscape not usually seen on mountainous terrain.

Today, the line is owned and operated by the Austrian Federal Railways some 160 years after its construction and plays a key role in connecting Vienna and Graz as part of the ÖBB Southern Railway. It was also listed as a UNESCO World Heritage site in 1998.

However, despite the fantastic scenery, towering bridges, challenging grades and rich history, a new 27.3km (16 mile) tunnel is being constructed under the mountains to bypass the Semmeringbahn, and is expected to open in 2024.

Included with this primarily freight route is a Class 1116 in ÖBB Livery, Habbins bogie van wagons, Zags bogie tanker wagons, SGGRSS container wagons, TDRRS two-axle hopper wagons and Bmz Eurofima coaches.

Scenarios


Seven scenarios for the route:
  • The Sound of Mountains
  • Morning Haul
  • High up the Hill
  • The Lonely Driver
  • Climb Every Mountain
  • My Favourite Things
  • I Have Confidence

More scenarios are available on Steam Workshop online and in-game. Train Simulator’s Steam Workshop scenarios are free and easy to download, adding many more hours of exciting gameplay. With scenarios being added daily, why don’t you check it out now!

Click here for Steam Workshop scenarios.

Key Features

  • 41km (25 mile) Semmeringbahn route from Mürzzuschlag and Gloggnitz
  • Stunning Alps scenery, including more than 100 stone bridges, 16 tunnels, 11 iron bridges and 14 viaducts
  • Locomotive yards at Mürzzuschlag
  • Famous viaducts at Schwarza, Kassulkraus and Kauterina
  • S6 motorway viaduct at Klamm-Schottwein
  • Class 1116 in ÖBB Livery
  • Habbins bogie van wagons, Zags bogie tanker wagons, SGGRSS container wagons and TDRRS two-axle hopper wagons
  • Bmz Eurofima coaches
  • Scenarios for the route
  • Quick Drive compatible
  • Download size: 1,719mb

系統需求

    Minimum:
    • OS *:Windows® Vista / 7 / 8
    • Processor:Processor: 2.8 GHz Core 2 Duo (3.2 GHz Core 2 Duo recommended), AMD Athlon MP (multiprocessor variant or comparable processors)
    • Memory:2 GB RAM
    • Graphics:512 MB with Pixel Shader 3.0 (AGP PCIe only)
    • DirectX®:9.0c
    • Hard Drive:6 GB HD space
    • Sound:Direct X 9.0c compatible
    • Other Requirements:Broadband Internet connection
    • Additional:Quicktime Player is required for playing the videos
    Recommended:
    • Graphics:Laptop versions of these chipsets may work but are not supported. Updates to your video and sound card drivers may be required
    • Additional:Quicktime Player is required for playing the videos
* 自 2024 年 1 月 1 日(PT)起,Steam 用戶端僅支援 Windows 10 及更新版本。

更多此遊戲的可下載內容

更多來自 Train Simulator Classic 的相關產品

顧客評論

評論類型


購得方式


語言


日期範圍
如欲檢視特定日期範圍內的評論,請在上方圖表框選一段日期範圍,或點擊直條。

顯示圖表



遊戲時數
依照使用者撰寫評論當時的遊戲時數篩選:


不限最低時數不限最高時數
顯示:
顯示圖表
 
隱藏圖表
 
篩選條件
排除離題評論活動
遊戲時數:
評論讀取中…