This content requires the base game JR EAST Train Simulator on Steam in order to play.

All Reviews:
Positive (13) - 84% of the 13 user reviews for this game are positive.
Release Date:
Jun 26, 2023
Developer:
Tags

Sign in to add this item to your wishlist, follow it, or mark it as ignored

Check out the entire East Japan Railway Company franchise on Steam

Downloadable Content

This content requires the base game JR EAST Train Simulator on Steam in order to play.

Buy JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series

 

About This Content

The Keiyo Line, which opened in 1990, is a relatively young line within JR East, connecting Chiyoda-ku, Tokyo, with Chiba City, Chiba Prefecture. Except for the underground section between Tokyo Station and Etchujima Station, the entire line is characterized by running on elevated tracks along Tokyo Bay. The area along the line is being redeveloped as reclaimed land on Tokyo Bay, and in addition to new towns, theme parks, large shopping malls, and offices are towering above the area.A delta line (connecting line) is provided from Nishi Funabashi Station on the Musashino Line to Ichikawa Shiohama Station and Minami Funabashi Station on the Keiyo Line, and Musashino Line trains operate directly to the Keiyo Line.

Highlights

  • Shinminato Signal Station/Chibaminato Station - Inagekaigan Station
  • Gateway to Makuhari New City/Kaihimmakuhari Station
    Large shopping centers, office buildings, hotels and residences line the street. As an environmentally friendly "eco-sta." a small wind power generator has been installed on the platform.
  • Keiyo Railcar Center/Kaihimmakuhari Station - Shin-Narashino Station
    This is the main depot for the Keiyo and Musashino Lines. A new station, Makuharitoyosuna Station, is currently in operation near here.
  • Yatsu Higata/Shin-Narashino Station - Minami-Funabashi Station
    It can be seen on the left just before Minami-Funabashi Station.
  • Junction with Musashino Line/Minami-Funabashi Station - Futamatashimmachi Station
  • Junction with Musashino Line/Futamatashimmachi Station - Ichikawashiohama Station
  • Edogawa/Futamatashimmachi Station - Ichikawashiohama Station
    Crossing the railway bridge over the Edogawa River.
  • Chiba Port/Ichikawashiohama Station - Shin-Urayasu Station
    You will continue to the left of Chiba Port.
  • Factory area / Shin-Urayasu Station - Maihama Station
  • Gateway to a large theme park/Maihama Station
  • Old Edo River/Maihama Station - Kasai-Rinkai Park Station
    You will cross a railroad bridge over the Old Edo River.
  • Ferris wheel at Kasai-Rinkai Park/Maihama Station - Kasai-Rinkai Park Station
  • Arakawa River / Kasai-Rinkai Park Station - Shin-Kiba Station
    Crossing the railroad bridge over the Arakawa River.
  • Connecting line with Tokyo Waterfront Area Rapid Transit Rinkai Line/Kasai-Rinkai Park Station - Shin-Kiba Station
  • Sunamachi Canal / Shin-Kiba Station - Shiomi Station
    Cross the Sunamachi Canal while making a large right turn.
  • From the elevated section to the underground section / Shiomi Station - Etchujima Station

Route Information

  • Section: Keiyo Line Soga→Tokyo Going up
  • Total length: 43.0 km
  • Number of Stations: 17 *Data before the opening of Makuhari Toyosuna Station is included.
  • Security equipment: ATS-P

Train schedules that can be operated

  • Train Number: 1510Y
  • Type/Destination: Local train bound for Tokyo
  • Station section that can be operated: Soga to Tokyo
  • Type of train: Series E233-5000 10 cars
  • Responsible for real voice train announcements: Soga train crew depot

  • Train Number: 780Y
  • Type/Destination: Local train bound for Tokyo
  • Station section that can be operated: Soga to Tokyo
  • Type of train: Series E233-5000 10 cars
  • Responsible for real voice train announcements: Soga train crew depot

System Requirements

    Minimum:
    • Requires a 64-bit processor and operating system
    • OS: 64-bit Windows 10
    • Processor: Intel Core i (6th generation) 4Cores or AMD Ryzen (1st generation) 4Cores
    • Memory: 16 GB RAM
    • Graphics: NVIDIA GeForce GTX 10 series (VRAM 2GB)
    • DirectX: Version 11
    • Storage: 20 GB available space
    • Additional Notes: need resolution 1920×1080@60Hz,DirectX 11.3
    Recommended:
    • Requires a 64-bit processor and operating system
    • OS: 64-bit Windows 10
    • Processor: Intel Core i5-6500 or AMD Ryzen 5 1400
    • Memory: 16 GB RAM
    • Graphics: NVIDIA GeForce GTX 1060
    • DirectX: Version 11
    • Storage: 20 GB available space

More DLCs from this game

More from East Japan Railway Company

Customer reviews

Review Type


Purchase Type


Language


Date Range
To view reviews within a date range, please click and drag a selection on a graph above or click on a specific bar.

Show graph



Display As:
Show graph
 
Hide graph
 
Filters
Excluding Off-topic Review Activity
Playtime:
Loading reviews...