This content requires the base game Trainz: A New Era on Steam in order to play.

All Reviews:
No user reviews
Release Date:
May 28, 2019
Developer:
Publisher:
Tags

Sign in to add this item to your wishlist, follow it, or mark it as ignored

Downloadable Content

This content requires the base game Trainz: A New Era on Steam in order to play.

Buy TANE DLC - Amtrak P42DC - Phase III

 

About This Content

Features include:

Full Custom Cab
Auto Running Numbers
Animated Wipers
Fan Animation
Ditch Lights
Marker Lights
Night Lighting
Fire Script
Cab Signals
Gecko Script
Amtrak operates more than 300 trains each day on 21,300 miles (34,000 km) of track with select segments having civil operating speeds of 150 mph (240 km/h) and connecting more than 500 destinations in 46 states in addition to three Canadian provinces. In fiscal year 2014, Amtrak served 30.9 million passengers and had $2.189 billion in revenue while employing more than 20,000 people. Nearly two-thirds of passengers come from the ten largest metropolitan areas and 83% of passengers travel on routes of 400 miles or less. Its headquarters is at Union Station in Washington, D.C.

Amtrak began operations in May 1971 with a mixture of equipment from its predecessor railroads, much of which was painted in a variety of railroad-specific paint schemes. This era was later referred to as the Rainbow Era, due to the mix-matched colorful trains Amtrak used. Amtrak elected not to keep the same rolling stock on the same routes and it was not unexpected to find rolling stock from anywhere in the US on any train. To build the brand of Amtrak as a unified passenger railroad, the equipment was gradually repainted into system-wide Phases starting around 1972 with Phase I.

The phases are referred in numerical sequential order, usually in Roman numerals. Up until the introduction of the Acela, phases were painted on all equipment. However since 2000 Amtrak has started splitting phases up between equipment with locomotives getting Phase V & cars getting Phase IVb. While previously locomotives and rail cars could be painted in different styles they were still referred to as being in the same phase, with often the locomotive versions getting an unofficial nickname. Phase III Phase III is a widely known paint scheme of Amtrak, introduced in 1980 and existing to this day on some equipment. This paint scheme used similar colors to those used on Phase II stripes, except that the outer white pinstripes were deleted and the red, white, and blue stripes were of approximately equal width. On locomotives the same black roof lining was kept. On some equipment, such as the LRC, the white stripe remained the same width while the red and blue were expanded to cover a larger area. Another distinguishing feature of this paint scheme is the labeling of every passenger car with its type and number in black lettering on the white stripe. This style of Phase III was used on Amtrak locomotives, passenger cars, and Material Handling Cars.

System Requirements

Windows
macOS
    Minimum:
    • OS *: Windows 7 64bit
    • Processor: Intel i5 3GHz 64Bit Processor
    • Memory: 4 GB RAM
    • Graphics: NVIDIA GT 430 or better/ AMD ATI 5550 or better
    • Storage: 100 MB available space
    • Sound Card: Yes
* Starting January 1st, 2024, the Steam Client will only support Windows 10 and later versions.
    Minimum:
    • OS: 10.12
    • Processor: Intel i5 2Ghz
    • Memory: 6 GB RAM
    • Graphics: Radeon Pro 555 with 1GB VRAM supporting OpenGL 3.3
    • Storage: 100 MB available space
* Starting February 15, 2024, the Steam Client will no longer support 32-bit games or macOS 10.14 or lower.
There are no reviews for this product

You can write your own review for this product to share your experience with the community. Use the area above the purchase buttons on this page to write your review.