Este artigo requer o jogo base JR EAST Train Simulator no Steam para poder ser jogado.

Todas as análises:
6 análises de utilizadores - São necessárias mais análises de utilizadores para que seja gerada uma classificação
Data de lançamento:
23 abr. 2024
Developer:
Marcadores

Inicia a sessão para adicionares este artigo à tua lista de desejos, segui-lo ou ignorá-lo.

Vê todos os jogos de East Japan Railway Company no Steam
Não disponível em Português (Portugal)

Este produto não está disponível no teu idioma local. Verifica a lista de idiomas disponíveis antes de fazeres a compra.

Conteúdo transferível

Este artigo requer o jogo base JR EAST Train Simulator no Steam para poder ser jogado.

Comprar JR EAST Train Simulator Oga Line Outbound(Akita to Oga)

 

Acerca deste conteúdo

The Oga Line is a 26.4 km long line connecting Oiwake Station in Akita City, Akita Prefecture, to Oga Station in Oga City, Akita Prefecture.All trains operate directly to the Ou Line, and this DLC includes a 39.4 km long section, including a portion between Akita Station and Oiwake Station on the Ou Line.
The Oga Line began service in 1913 as the Funakawa Light Rail Line connecting Oiwake and Futada Stations, and later in 1916 the entire line was opened to Funakawa Station, which is now Oga Station. Currently, only regular trains operate on the line, but in the past, the night express train "Oga" departing from Ueno Station used to run to Oga Station as a temporary train.
The maximum speed changes depending on the section of track (Ou Line section: 95 km/h, Oga Line section: 85 km/h), and all trains are operated as one-man trains. (*In this DLC, implemented in two-man specification)
The EV-E801 series AC battery-powered trains began operating on the Oga Line in 2017, and now all trains on the line are operated by the EV-E801 series. The EV-E801 Series runs in two modes: between Akita Station and Oiwake Station, the electrified section, it runs on electricity from overhead wires, while between Oiwake Station and Oga Station, the non-electrified section, it runs on electricity stored in storage batteries with the pantographs down. The first track at Oga Station is equipped with recharging facilities so that passengers can recharge their batteries during the time the train stops before turning around.
On the way to Oiwake Station, the Ou Line section runs through a bedroom town of Akita City. After leaving Oiwake Station, the train enters the Oga Line section, where fields along the line become conspicuous, and from the Wakimoto Station area, the train winds through mountainous areas. Please enjoy driving the EV-E801 series AC battery-powered train with the sightseeing spot "Mt. Kanpuzan" in Oga City, Akita Prefecture in this DLC.

*For production reasons, images recorded with Kiha 40 and 48 series are used. Please be forewarned.

Highlights

  • Akita Freight Station /Akita Station - Tsuchizaki Station
    Akita Freight Station, located between Akita Station and Tsuchizaki Station, is one of the arrival and departure stations for freight trains and is used for loading and unloading cargo.
  • Akita General Rolling Stock Center Minami Akita Center /Akita Station - Tsuchizaki Station
    The Akita General Rolling Stock Centre Minami Akita Centre, located between Akita Station and Tsuchizaki Station, carries out daily inspections of rolling stock and performs yard switching operations. 
  • Running alongside the Ou Line /Oiwake Station - Detohama Station
    After departing from Oiwake Station, the train runs right next to the Ou Line and branches off toward Oga. 
  • Mt. Kanpu and Hachiro River (Hachiro River Bridge) /Tenno Station - Funakoshi Station
    Between Tenno and Funakoshi Stations, there is the Hachiro River Bridge, which consists of 14 piers. The train can be driven while viewing the most spectacular scenery on the Oga Line, with the 'Mt.Kanpu' in front and the 'Hachiro River' to the left and right.
  • Chausu Pass (Oga Tunnel)/Wakimoto Station - Hadachi Station
    The section between Wakimoto Station and Hadachi Station is the only section of the Oga Line that runs through a tunnel. Because of the gradient, this is a section where the train must be driven while being aware of speed adjustments. 
  • Oga Station Old Station Building /Oga Station
    Oga Station was newly built in 2018 as an environmentally friendly "Eco-Station" model station. You can see the "old station building" of Oga Station on the right side of the Oga Station premises.

Supplementary information

While the train is stopped at Oiwake station, the pantographs are lowered to switch to the storage battery running mode. (The entire series of operations is performed automatically.)
Therefore, if the train overruns at Oiwake Station, the emergency brake is applied due to a protective action.
In this case, the emergency brake cannot be released until the pantograph is lowered, and the user cannot lower the pantograph himself, so it can only be restored by selecting the "End Play" or "Change Station" button.

Route Information

  • Section: Oga Line Outbound Akita ⇒ Oga
  • Total length: 39.4 km
  • Number of Stations: 12 *Data before the opening of Izumi-Sotoasahikawa Station is included.
  • Security equipment: ATS-Ps

Train schedules that can be operated

  • Train Number:1127M
  • Type/Destination: Local train to Oga
  • Section where you can drive: Akita(08:52) → Oga(09:49)
  • Type of train: Series EV-E801 2 cars
  • Responsible for real voice train announcements: Akita train crew depot

  • Train Number:1131M
  • Type/Destination: Local train to Oga
  • Section where you can drive: Akita(12:09) → Oga(13:07)
  • Type of train: Series EV-E801 2 cars
  • Responsible for real voice train announcements: Akita train crew depot

  • Train Number:1133M
  • Type/Destination: Local train to Oga
  • Section where you can drive: Akita(13:38) → Oga(14:34)
  • Type of train: Series EV-E801 2 cars
  • Responsible for real voice train announcements: Akita train crew depot

  • Train Number:1135M
  • Type/Destination: Local train to Oga
  • Section where you can drive: Akita(15:28) → Oga(16:28)
  • Type of train: Series EV-E801 2 cars
  • Responsible for real voice train announcements: Akita train crew depot

Requisitos do Sistema

    Mínimos:
    • Requer um sistema operativo e processador de 64 bits
    • Sistema Operativo: 64-bit Windows 10
    • Processador: Intel Core i (6th generation) 4Cores or AMD Ryzen (1st generation) 4Cores
    • Memória: 16 GB de RAM
    • Placa gráfica: NVIDIA GeForce GTX 10 series (VRAM 2GB)
    • DirectX: Versão 11
    • Espaço no disco: Requer 15 GB de espaço livre
    • Notas adicionais: need resolution 1920×1080@60Hz,DirectX 11.3
    Recomendados:
    • Requer um sistema operativo e processador de 64 bits
    • Sistema Operativo: 64-bit Windows 10
    • Processador: Intel Core i5-6500 or AMD Ryzen 5 1400
    • Memória: 16 GB de RAM
    • Placa gráfica: NVIDIA GeForce GTX 1060
    • DirectX: Versão 11
    • Espaço no disco: Requer 15 GB de espaço livre

Mais DLCs deste jogo

Outros jogos da série "East Japan Railway Company"

Análises de clientes

Tipo de análise


Tipo de aquisição


Idioma


Intervalo de datas
Para veres análises feitas num certo intervalo de datas, clica e arrasta uma seleção num gráfico acima ou clica numa barra específica.

Mostrar gráfico



Apresentação
Mostrar análises na ordem de apresentação selecionada




Mostrar gráfico
 
Ocultar gráfico
 
Filtros
A excluir atividade de análises irrelevantes
Tempo de jogo:
A carregar análises...