Dette indhold kræver grundspillet JR EAST Train Simulator på Steam for at kunne spilles.

Log på for at føje dette emne til din ønskeliste, følge det eller markere det som ignoreret

Indhold, der kan downloades

Dette indhold kræver grundspillet JR EAST Train Simulator på Steam for at kunne spilles.

Køb JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series

 

Om dette indhold

The Oito Line is a 105.4 km long line connecting Matsumoto Station in Nagano Prefecture to Itoigawa Station in Niigata Prefecture. The 70.1 km route between Matsumoto Station and Minami-Kotani Station, which is under the jurisdiction of JR East, is well-known as a stop for customers visiting the mountain climbing and snow resort areas represented by Shinano-Omachi and Hakuba. The "Super Azusa" limited express train runs directly from Shinjuku Station, and the line is also used as a commuter and school route in the Matsumoto area. From the driving scenery, you can experience the changing scenery of Shinshu from winter to spring with the magnificent snow-capped Northern Alps, cherry blossoms along the tracks, and rice paddies filled with water for the summer.

Highlights

  • Azusa River Railroad Bridge / Shimatakamatsu to Azusa Bridge
     Cross the Azusa River flowing from the Northern Alps.
  • Northern Alps / Azumi-Kutsugake~Shinano-Tokiwa
     You will enjoy the contrast between winter and spring with the snow-capped Northern Alps and beautifully blooming cherry blossoms.
    [Shinano-Omachi Station
     Shinano-Omachi Station is the gateway to the Tateyama-Kurobe Alpine Route, a mountain tourism route that runs through the Northern Alps to Toyama. The station, with its hut-like station building, rail bridge, and spacious interior, conveys the bustle of the area. 

Route information

  • Section: Oito Line Matsumoto→Minami-Otari Outbound
  • Total length: 70.1 km
  • Number of stations: 33
  • Safety equipment: ATS-Ps

Train schedules that can be operated

  • Train number: 5329M
  • Type/Destination: Local Train to Minami-Otari
  • Station section that can be operated: Matsumoto to Minami-Otari
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto Crew Supervisory Center

  • Train number: 3113M
  • Type/Destination: Local Train to Hotaka
  • Station section that can be operated: Matsumoto to Hotaka
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto Crew Supervisory Center

  • Train number: 3241M
  • Type/Destination: Local Train to Shinano-Omachi
  • Station section that can be operated: Matsumoto to Shinano-Omachi
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto Crew Supervisory Center

Systemkrav

    Minimum:
    • Kræver en 64-bit processor og operativsystem
    • Styresystem: 64-bit Windows 11
    • Processor: Intel Core i5-8500 or AMD Ryzen 5 2600
    • Hukommelse: 16 GB RAM
    • Grafik: NVIDIA GeForce GTX 1060 (VRAM 6GB)
    • DirectX: Version 12
    • Diskplads: 20 GB tilgængelig plads
    • Yderligere bemærkninger: need resolution 1920×1080@60Hz
    Anbefalet:
    • Kræver en 64-bit processor og operativsystem
    • Styresystem: 64-bit Windows 11
    • Processor: Intel Core i5 12400 or AMD Ryzen 5 5500
    • Hukommelse: 16 GB RAM
    • Grafik: NVIDIA GeForce RTX 3060 (VRAM 8GB)
    • DirectX: Version 12
    • Diskplads: 20 GB tilgængelig plads
    • Yderligere bemærkninger: Recommended SSD

Kundeanmeldelser for JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series Om brugeranmeldelser Dine præferencer

Samlede anmeldelser:
Positive (27 anmeldelser)






For at se anmeldelser indenfor et datointerval kan du klikke og trække et interval på grafen ovenfor eller klikke på en specifik bjælke.




Vis anmeldelser i valgt visningsrækkefølge





Læs mere
Filtre
Eksklusive irrelevant anmeldelsesaktivitet
Spilletid:
Spillet mest på Steam Deck
Operativsystem:
CPU:
GPU:
Enhedstype:
Indlæser anmeldelser...